Cortina d’Ampezzo—Ski resort proto-piste/trail map—mountain panoramas—RACI 1939
$238
SKU
[Neve in montagna: guide autosciatorie, I serie, no. 13:] Cortina d’Ampezzo
An exceptionally early Italian ski-area map of Cortina d’Ampezzo, published in 1939 as mechanical uplift was transforming the resort. Its Istituto Geografico Militare contour base is overprinted with red downhill routes and flagged starting points, blue-shaded ski grounds, blue approach roads and green lift lines. These include the Col Drusciè slittovia and aerial cableways towards Pocol and Faloria. Labelled winter photographs around all four sides identify Cristallo, the Tofane and neighbouring Dolomite peaks, helping skiers translate the conventional plan into the mountain landscape. The design therefore performs the two jobs of a modern piste map—route planning and intuitive recognition of terrain—but keeps them graphically separate. Produced as Heinrich C. Berann’s pioneering oblique winter panoramas were emerging, it is a compelling transitional or “proto-modern” piste map: a precursor in design to the familiar all-in-one panoramic form, though contemporary with its earliest examples. Particularly evocative is the slittovia, a now-obsolete cable-hauled passenger sledge, winched uphill over snow before chairlifts and surface lifts displaced it. Faloria’s cableway opened on 5 February 1939, while the Cortina–Belvedere connection to Pocol has since disappeared: the map preserves both the beginnings of a familiar landmark and a lost chapter of the resort’s skiing history.
Size 32 x 32 cm | 12.5 x 12.5 inches
Date Published: 1939
Type: Folding topographic proto-ski piste/trail map in original illustrated guide wrapper
Author: Reale Automobile Club d’Italia
Publication: Neve in montagna
Condition: Good |
Delivery & Returns
Packing
Items smaller than A4 size are usually packed in a stiffened, board-backed envelope. Larger items are rolled and packed in postal tubes. Large items which are too stiff to be rolled in wide-diameter tubes are mailed in all-board envelopes. In the unlikely event of damage in transit, please send the affected item or items back to us and we will provide a replacement or refund.
Delivery
Economy, tracked and express shipping options are available to all destinations worldwide. Over half our orders are sent to customers outside the United Kingdom and we have supplied over 30,000 buyers in over 70 different countries. We ship orders virtually every business day to customers in North America and Europe. The cost of delivery depends on the size of the largest item in your order, where you are located, and the delivery method that you choose at checkout. For orders received before 2pm, we can arrange delivery next day in the UK, within 2 business days to continental Europe and North America, and within 4 days to most other countries worldwide (excludes PO Box or APO/FPO (Military) addresses).
Returns
We accept returns for any reason if sent back to us within 14 days of receipt of your order. If any of your items are not as described, we will provide a full refund including reasonable return postage costs upon safe return to us. If you have changed your mind, you are responsible for the cost of returning the item to us. We describe the size, age and condition of all our products as fully and accurately as possible. Most of the items which we sell are in very good condition. However, the condition of antique and vintage prints and maps can vary. All of our product listings including a statement which classifies the condition as being either “Good”, “Fair”, or (rarely) “Poor” and which describes any material flaws, blemishes, imperfections or other significant features such as folds. Please read the description carefully before purchase.
Can we help? For more details or any questions.