Gressoney La Trinité—Ski resort proto-piste/trail map and panoramas—RACI 1939
£130
SKU
[Neve in montagna: guide autosciatorie, I serie, no. 4:] Gressoney La Trinité
An exceptionally early Italian ski-area map of Gressoney-La-Trinité beneath Monte Rosa, recording a landscape of ski touring before the development of its modern lift network. Published around 1939, its Istituto Geografico Militare contour base is overprinted with red downhill routes, flagged starting points, blue-shaded ski grounds and the blue access road from Pont-Saint-Martin. Arrows indicate routes continuing towards Bettaforca, Lago Gabiet and Colle d’Olen, while labelled winter photographs around all four sides identify the surrounding skyline, including Castore and Lyskamm. No lift is plotted, although the standard legend includes slittovie—now-obsolete cable-hauled passenger sledges—and aerial cableways. The design therefore performs the two jobs of a modern piste map—practical route planning and intuitive recognition of mountain terrain—but keeps them as separate visual systems. Produced as Heinrich C. Berann’s pioneering oblique winter panoramas were emerging, it is a fascinating transitional or “proto-modern” piste map: a precursor in design to the familiar all-in-one panoramic form, though contemporary with its earliest examples. Gressoney’s Punta Jolanda chairlift followed in 1957, almost two decades later. Retained with its original illustrated motoring-guide folder, the sheet captures an earlier relationship between the village, its approach road and the surrounding snowfields.
Size 32 x 32 cm | 12.5 x 12.5 inches
Date Published: 1939
Type: Folding topographic proto-ski piste/trail map in original illustrated guide wrapper
Author: Reale Automobile Club d’Italia
Publication: Neve in montagna
Condition: Good |
Delivery & Returns
Packing
Items smaller than A4 size are usually packed in a stiffened, board-backed envelope. Larger items are rolled and packed in postal tubes. Large items which are too stiff to be rolled in wide-diameter tubes are mailed in all-board envelopes. In the unlikely event of damage in transit, please send the affected item or items back to us and we will provide a replacement or refund.
Delivery
Economy, tracked and express shipping options are available to all destinations worldwide. Over half our orders are sent to customers outside the United Kingdom and we have supplied over 30,000 buyers in over 70 different countries. We ship orders virtually every business day to customers in North America and Europe. The cost of delivery depends on the size of the largest item in your order, where you are located, and the delivery method that you choose at checkout. For orders received before 2pm, we can arrange delivery next day in the UK, within 2 business days to continental Europe and North America, and within 4 days to most other countries worldwide (excludes PO Box or APO/FPO (Military) addresses).
Returns
We accept returns for any reason if sent back to us within 14 days of receipt of your order. If any of your items are not as described, we will provide a full refund including reasonable return postage costs upon safe return to us. If you have changed your mind, you are responsible for the cost of returning the item to us. We describe the size, age and condition of all our products as fully and accurately as possible. Most of the items which we sell are in very good condition. However, the condition of antique and vintage prints and maps can vary. All of our product listings including a statement which classifies the condition as being either “Good”, “Fair”, or (rarely) “Poor” and which describes any material flaws, blemishes, imperfections or other significant features such as folds. Please read the description carefully before purchase.
Can we help? For more details or any questions.