London Passenger Transport Board. Map of New Works Programme 1935 - 1940 [Print code 38-1054 G 90M]
The LPTB New Works Programme (officially the 1935–1940 New Works Programme) was a major infrastructure and modernisation initiative launched by the London Passenger Transport Board (LPTB) in 1935. It aimed to expand and improve London’s public transport system to meet growing demand and support suburban development. The programme sought to extend the Underground into growing suburbs, replace outdated infrastructure, electrify and modernise older lines, integrate mainline rail services with the Underground, and improve capacity, speed, and reliability across the network. Major projects included the Northern Heights Plan, extending the Northern line to incorporate LNER branches to High Barnet, Alexandra Palace, and Edgware (partially completed); Central line extensions eastward to Ongar and westward to West Ruislip (completed post-war); the Bakerloo line extension to Stanmore (completed in 1939); Piccadilly line expansion west to Uxbridge and groundwork for Heathrow; new rolling stock and station upgrades; and trolleybus replacement for trams on key corridors. The programme was interrupted by World War II in 1939, with many projects delayed or cancelled. However, parts were revived and completed in the post-war period, forming the basis of London’s modern Underground network. It remains one of the most ambitious and forward-thinking transport investment plans in London’s history.
Size 45 x 59 cm | 17.5 x 23.0 inches
Date Published: 1938
Type: Antique colour public transportation map
Author: London Passenger Transport Board
Publication: London Passenger Transport Board Annual Reports
Condition: Good |
Delivery & Returns
Packing
Items smaller than A4 size are usually packed in a stiffened, board-backed envelope. Larger items are rolled and packed in postal tubes. Large items which are too stiff to be rolled in wide-diameter tubes are mailed in all-board envelopes. In the unlikely event of damage in transit, please send the affected item or items back to us and we will provide a replacement or refund.
Delivery
Economy, tracked and express shipping options are available to all destinations worldwide. Over half our orders are sent to customers outside the United Kingdom and we have supplied over 30,000 buyers in over 70 different countries. We ship orders virtually every business day to customers in North America and Europe. The cost of delivery depends on the size of the largest item in your order, where you are located, and the delivery method that you choose at checkout. For orders received before 2pm, we can arrange delivery next day in the UK, within 2 business days to continental Europe and North America, and within 4 days to most other countries worldwide (excludes PO Box or APO/FPO (Military) addresses).
Returns
We accept returns for any reason if sent back to us within 14 days of receipt of your order. If any of your items are not as described, we will provide a full refund including reasonable return postage costs upon safe return to us. If you have changed your mind, you are responsible for the cost of returning the item to us. We describe the size, age and condition of all our products as fully and accurately as possible. Most of the items which we sell are in very good condition. However, the condition of antique and vintage prints and maps can vary. All of our product listings including a statement which classifies the condition as being either “Good”, “Fair”, or (rarely) “Poor” and which describes any material flaws, blemishes, imperfections or other significant features such as folds. Please read the description carefully before purchase.
Can we help? For more details or any questions.