Passo Sella/Val Gardena—Ski resort proto-piste/trail map & panoramas—RACI 1939

£150

SKU

[Neve in montagna: guide autosciatorie, I serie, no. 12:] Passo Sella


An exceptionally early Italian ski-area map of Passo Sella, covering the routes between Selva di Val Gardena and Canazei around the Sella and Sassolungo groups. Published in 1939, its Istituto Geografico Militare contour base is overprinted with numerous red downhill ski routes, flagged starting points, blue-shaded ski grounds and the access approach from Selva. Labelled photographic panoramas frame the plan, identifying Ciampinoi, Sass Rigais, the Puez plateau, the Torri di Sella and Cima Boè; one photograph also marks the funivia near Ciampinoi. The sheet thus performs the two jobs of a modern piste map—route planning and immediate recognition of mountain terrain—but keeps them as separate visual systems. Produced just as Heinrich C. Berann’s pioneering oblique winter panoramas were emerging, it is a particularly attractive transitional or “proto-modern” piste map: a precursor in design to the familiar all-in-one panoramic form, though contemporary with its earliest examples. The series legend’s slittovia was a now-obsolete cable-hauled passenger sledge, winched uphill before chairlifts and surface lifts took over. The Sassolungo–Ciampinoi installation was constructed in 1938–39, making this a striking record of Val Gardena’s first mechanised skiing, decades before the interconnected Sellaronda transformed the district.

Select:

Size 32 x 32 cm | 12.5 x 12.5 inches

Date Published: 1939

Type: Folding topographic proto-ski piste/trail map in original illustrated guide wrapper

Author: Reale Automobile Club d’Italia

Reale Automobile Club d’Italia, Sede Provinciale di Milano, compiler

Publication: Neve in montagna

Neve in montagna: guide autosciatorie. Bergamo: Istituto Italiano d’Arti Grafiche

Condition: Good |

Good; suitable for framing. Please check the scan for any blemishes prior to making your purchase. This is a folding map. On the reverse is Italian resort information, photographic panoramas and advertising

Delivery & Returns

Packing

Items smaller than A4 size are usually packed in a stiffened, board-backed envelope. Larger items are rolled and packed in postal tubes. Large items which are too stiff to be rolled in wide-diameter tubes are mailed in all-board envelopes. In the unlikely event of damage in transit, please send the affected item or items back to us and we will provide a replacement or refund.

Delivery

Economy, tracked and express shipping options are available to all destinations worldwide. Over half our orders are sent to customers outside the United Kingdom and we have supplied over 30,000 buyers in over 70 different countries. We ship orders virtually every business day to customers in North America and Europe. The cost of delivery depends on the size of the largest item in your order, where you are located, and the delivery method that you choose at checkout. For orders received before 2pm, we can arrange delivery next day in the UK, within 2 business days to continental Europe and North America, and within 4 days to most other countries worldwide (excludes PO Box or APO/FPO (Military) addresses).

Returns

We accept returns for any reason if sent back to us within 14 days of receipt of your order. If any of your items are not as described, we will provide a full refund including reasonable return postage costs upon safe return to us. If you have changed your mind, you are responsible for the cost of returning the item to us. We describe the size, age and condition of all our products as fully and accurately as possible. Most of the items which we sell are in very good condition. However, the condition of antique and vintage prints and maps can vary. All of our product listings including a statement which classifies the condition as being either “Good”, “Fair”, or (rarely) “Poor” and which describes any material flaws, blemishes, imperfections or other significant features such as folds. Please read the description carefully before purchase.

Can we help? For more details or any questions.

Recently Viewed

Condition Guide

We assess the condition of each item using three categories: Good, Fair, and Poor. We strive to ensure that any significant flaws are clearly shown in the images provided and detailed in the accompanying condition statement.

Good

The item presents well, with no significant flaws, and is in frameable condition. Minor imperfections—such as light spotting or offsetting, small blemishes, tight margins, neatly repaired tears, or discreet/professionally executed restoration—do not materially detract from its overall appearance.

Fair

The item shows noticeable flaws but remains in frameable condition. Some buyers may feel these imperfections affect its visual appeal. Typical issues may include more prominent spotting, blemishes, bleed-through from the reverse, obvious offsetting, visible or extensive restoration, wear along fold lines or junctures, small wormholes, trimmed or closely cropped edges, or less carefully executed repairs.

Poor

The item has major flaws that significantly impact its presentation and/or suitability for framing. These may include heavy spotting, staining, bleed-through, offsetting, unrepaired damage, or poorly executed repairs such as tears, holes, or areas of paper loss (including within the printed image). The item may also be fragile and prone to further deterioration.